The installation steps of a network cabinet are relatively complicated. From preparation to installation to debugging, certain methods need to be followed. First, it is necessary to draw the internal wiring diagram and equipment location diagram of the network cabinet based on factors such as network layout, existing equipment conditions, number of users and user groups, and prepare necessary materials such as network jumpers, label paper and various plastic tiras .
Next, assemble the network cabinet. First, fix the top cover to the bottom plate, then install the heel casters and columns, side beams and fans, and finally install the fixed shelves, and finally fix the front and rear side doors. Before placing the equipment, internal accessories need to be installed according to the equipment conditions.
Ao organizar o gabinete de rede, é necessário agrupar os cabos da rede (o número geralmente não excede o número de racks de arame na parte traseira do gabinete), agrupa os cabos de energia, insira os plugues através dos orifícios do fio traseiro e use um rack de gerenciamento de cabos separado para encontrar a localização do equipamento correspondente .}}}
Ajuste a posição dos defletores internos do gabinete para que o administrador possa visualizar o status de operação de todos os equipamentos sem abrir a porta do gabinete e aumentar adequadamente os defletores de acordo com o número e o tamanho do equipamento, garantindo que haja uma certa lacuna entre os desenhos .}}} 2 e {} 2.}}}}} {} 2}}} {}}}}}
Depois que todos os cabos de rede estão conectados, eles precisam ser marcados, embrulhados com notas pegajosos e marcado (geralmente com números ou propósitos de quarto) . Se houver muitos dispositivos, eles devem ser classificados, numerados e rotulados .
Depois de terminar o arranjo, teste o gabinete da rede, ligue a energia e teste a conectividade da rede para garantir que tudo seja normal .

